Customization: | Available |
---|---|
After-sales Service: | Online Support |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 0.1/Square Meter
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment methods: | |
---|---|
Support payment in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Modular operating room design
OT room Cleanliness
|
Available from class 100 to class 10000 |
Structure | Wall Panel, Ceiling filtering system, Windows, Doors, Flooring,AHU etc |
HVAC | AHU, Ducting, Piping, Chiller, dehumidifier, etc |
Equipment | Medical cabinet,Control panel,automatic sliding door,LED purification Ceiling,X-RAY film viewer,Control panel,Medical gas panel,Operating room shadowless lamp,table etc |
Application | Operation Theatre, Hospital Center, ICU, etc. |
New Environmental Laminated board | Traditional Spraying board | |
1. can't be scratched by cart or sharp items 2. dust-proof and Antibacterial 3. quick assemble and can be move to different place to reassemble 4. easy to disassembly 5. easy to clean 6. no fingerprint |
1.easy to scratch 2.easy to discolor(yellowing after 1.5 years) 3.disposable 4. difficult to clean and maintain |
|
Production time | 15 days | 30days |
Installation time | 3-5days | 15-20days |
Work life | 10 years | 3-4year |
We have already cooperated with local hospital projects for operation room in many countries, Kazakhstan,Bangladesh,Cambodia,Somalia,Indonesia,Uzbekista,Uganda,United States,Mozambique,Philippines,Rwanda.
Q:Where have you exported your equipment?
A:We've already exported to more than 30 countries in Aisa,Europe,Middle East,Africa,South America.etc.
Q:Can you arrange the visit to your user?Can you customized the machine according to our requirements?
A:Yes,Of course!
Q:Is your equipment in accordance with GMP,WHO?
A:Yes,we will design and manufacture the equipment according to the requirement of GMP/WHO in your company.
Q:How about your after sale service?
A:We will reply you within 24hours by email or phone.
Q:How about the staff training?
A:Normally,we will train your staffs during the installation in your site,you are also welcome to send your staff train in our
factory.
Q:How long will the turnkey project take?
A: Depends on the project. The longest time will about 1 year from designing the layout to finish installation and commissioning.
Q:Which kind of after-sales service you can offer?
A:Except the regular service ,we can also provide you know-how transfer,and dispatch our qualified engineers to help you run the factory up to 6-12 months.